What’s New in Akumal – January 2020

 

If anyone knows why this bench got clausurado’d, please share.

 

 

 

 

 

 

Some road work was done in December, and will continue for about two weeks.

The first foto is of a section of gunky rock/cement/adocreto that was replaced on the road seam between Villas Flamingo and La Joya condos.  Another nasty road seam was repaired between Playa Blanca and Del Sol condos.

The second foto is of a drain that was made to clear the water  when the street in front of Playa Blanca and Del Sol condos floods.  The metal drain itself was donated by Jaime at the blue Midway store.  It’s possible another drain will be needed.  Vamos a ver . . .

The third foto shows the beginning of the rebuilding of the section of road in front of Lol Ka’naab condos.  The plan is to eliminate the dip, making tis section match up with paving on either side.

 

Be the first to comment

Leave a Reply

Your email address will not be published.


*